Buchi Rotavapo R-220 SE Uživatelský manuál Strana 50

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 109
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 49
5 Putting into operation
50 R-220 SE Operation Manual, Version F
a
b
c
d
e
a
Start with the distribution piece and mount it at the gearbox.
b
Proceed with the expansion vessel. Mind upright installation!
c
Use the u-shaped bridge tube to roughly align the first condenser to the expansion
vessel.
Fix the u-tube at the expansion vessel and subsequently bring in the condenser.
Fasten the condenser. Fix the tube to the condenser.
d
Use the y-shaped bridge tube to roughly align the outlet of the second condenser to the
first condenser from below.
Fix the y-piece at the first condenser outlet.
Subsequently bring in the second condenser, fasten it and fix the y-piece.
e
Align the receiving flask to the y-piece and fasten the clamp.
Zobrazit stránku 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 108 109

Komentáře k této Příručce

Žádné komentáře